Revision History

 

 

 

E

Revise Construction Programme in Appendix B

27 Sept 2018

D

Revised as per EPD’s comments

12 July 2018

C

Revised as per IEC’s comments

23 May 2018

B

Revised as per IEC’s and ET’s comments

16 May 2018

A

First Issue

21 Feb 2018

Rev.

Description of Modification

Date

 

 

 

Table of Contents

1      INTRODUCTION.. 0

1.1  Project Description. 1

1.2  Purpose of the Plan. 2

1.3  Environmental Management Policy. 3

1.4  The Waste Management Policy. 7

1.5  Regulations and Guidelines. 8

2      SITE ORGANIZATION AND STAFF DUTIES. 12

2.1  Organization Structure. 12

2.2  Roles and Responsibilities. 13

3      SITE SPECIFIC WASTE MANAGEMENT.. 20

3.1  Waste Policy Principles. 20

3.2  Waste Reduction. 21

4      WASTE MANAGEMENT PROCEDURE.. 22

4.1  Estimate Quantities of C&D Materials / Wastes. 22

4.2  Acceptance Criteria for the Government Disposal Facilities. 23

4.3  Procedures of the Trip Ticket System (Disposal of C&D materials from Portion 7) 25

4.4  Procedures of the Trip Ticket System (Vessel to land: Disposal of non inert C&D materials from Artificial Island at Shek Kwu Chau to landfills) 27

4.5  Procedures of the Trip Ticket System (Vessel disposal: Disposal of inert C&D wastes from Artificial Island at Shek Kwu Chau to Fill Banks) 29

4.6  Measures to be implemented during transportation of wastes to avoid leakage of wastes on public areas. 30

4.7  Disposal of C&D Materials to Alternative Disposal Ground(s) 31

4.8  Chemical Waste/ Hazardous Waste Handling and Disposal 32

4.9  General Refuse. 33

4.10  Handling of Recyclables. 34

4.11  Handling of Marine Sediment 34

5      NOTIFICATION TO TRUCK DRIVERS / VESSEL MASTER.. 36

6      WASTE MANAGEMENT RECORDS. 37

7   WASTE MONITORING AND AUDIT.. 39

 

 

AppendiCEs

 

A.       Site Layout Plans

B.        Tentative construction Programme

C.        Application Guide (Form 7) – Application for Vessel to be approved for Delivering Inert Construction Waste to Public Fill Reception Facilities

D.       Flow Chart of the Trip Ticket System

E.        Notification to Dump Truck Drivers

F.        Daily Record Summary for C&D Waste Disposal

G.       Waste Flow Table for C&D Waste Disposal

H.       Environmental Mitigations Implementation Schedules (EMIS)

I.          Daily Cleanliness and Weekly Tidiness Checklists

J.         Layout Plan of Proposed Temporary Storage and Sorting Area for C&D Materials

K.       Proposed Ground Investigation Layout Plan

 

 

 


1        INTRODUCTION

 

The Government of Hong Kong SAR will develop the Integrated Waste Management Facilities (IWMF) Phase 1 (hereafter “the Project”) with incineration to achieve substantial bulk reduction of unavoidable municipal solid waste (MSW) and to cover energy from the incineration process. The IWMF will be on an artificial island to be formed by reclamation at the south-western coast of Shek Kwu Chau. Keppel Seghers – Zhen Hua Joint Venture (KSZHJV) was awarded the contract under Contract No. EP/SP/66/12 Integrated Waste Management Facilities Phase 1 to construct and operate the Project.

 

An environmental impact assessment (EIA) study for the Project have been conducted and the EIA Report was approved under the Environmental Impact Assessment Ordinance on 17 January 2012. An Environmental Permit (EP) (EP No.: EP-429/2012) was granted to EPD on 19 January 2012 for the construction and operation of the Project. Subsequently, the EP was amended (EP No.: EP-429/2012/A) and a further EP (FEP) (EP No.: FEP-01/429/2012/A) was granted to the Keppel Seghers – Zhen Hua Joint Venture (KSZHJV) on 27 December 2017.

 

As specified in Condition 2.16 of the FEP:

“At least 1 month before the commencement of construction of the Project, 3 hard copies and 1 electronic copy of a waste management plan (WMP) for construction stage of the Project shall be deposited with the Director. The WMP shall describe the arrangements for avoidance, reuse, recovery and recycling, storage, collection, treatment and disposal of different categories of waste to be generated from the construction activities and shall include the recommended mitigation measures on waste management in the EIA Report. The WMP shall indicate the disposal location (s) of all surplus excavated spoil and other wastes. A trip ticket system shall be included in the WMP. Surplus excavated spoil and other wastes shall only be disposed of at designated disposal locations unless otherwise approved by the Director.

 

Before submission to the Director, the WMP shall be certified by the ET Leader and verified by the IEC as conforming to the recommendations contained in the approved EIA report (Register No.: AEIAR-163/2012).

 

All measures recommended in the deposited WMP shall be fully and properly implemented for the Project.”

 

Pursuant to Condition 2.16 of the FEP, a waste management plan for the construction stage of the Project was developed and deposited with the Director of Environmental Protection.

 

1.1  Project Description

 

“Integrated Waste Management Facilities, Phase 1” is one single Contract for the Design, the Works and the Operation of the Facility on the Artificial Island at Portion 1 of the Site, the Existing Facilities in Portion 2 of the Site, the Air Quality Monitoring Stations (AQMSs) at Portions 3 to 5 of the Site, the Temporary Storage Facility during T&C stage at Portion 6 of the Site and the Temporary Storage Area at Portion 7 of the Site. The Site Layout Plans are attached in Appendix A.

 

General description of the Project is highlighted below: -

(1) to take reception of Municipal Solid Waste from the Refuse Transfer Stations daily;

(2) to treat a maximum of 3,000 tpd of Municipal Solid Waste by means of moving grate incineration technology and a maximum of 200 tpd of Municipal Solid Waste by mechanical treatment;

(3) to export Surplus Electricity to the power grid of the Power Company;

(4) to provide Surplus Electricity to the vessels of the Refuse Transfer Stations when they are berthing at the Facility via onshore power supply systems;

(5) to deliver Ash and Residues from the Artificial Island to Portion 2 of the Site;

(6) to dispose of Ash and Residues at the Designated Landfill; and

(7) to refurbish the Existing Facilities within two years from the commencement of the Operation Period, during the on-going and without detriment to the Operation.

 

The key design and construction elements of the Project include: -

(1) the Design and the Works including but not limited to the design, engineering procurement, construction, testing and commissioning of the Facility including: -

(i) Ground Treatment works;

(ii) Seawall and Breakwater construction;

(iii) Non-dredged Reclamation;

(iv) Other Marine works and Harbour and Port Facilities,

(v) Site formation,

(vi) Municipal Solid Waste (MSW) Treatment Processes,

(vii) Energy Recovery for Power Generation and Surplus Electricity export,

(viii) Wastewater treatment process,

(ix) Desalination and water treatment process,

(x) Civil works;

(xi) Building and Structural works,

(xii) Electrical and Mechanical works,

(xiii) Building Services,

(xiv) Architectural and Landscaping works, and

(xv) All other design and works required for the operation and maintenance of the Facility according to the Contract requirements.

Both stages shall include the provision of all necessary equipment, Constructional Plant, Plant, Mobile Plant, Temporary Works, labour, materials, tools, work, skills, expertise, services and transport as necessary in accordance with the Specification.

A tentative Construction Programme is attached in Appendix B.

1.2   Purpose of the Plan

 

This Waste Management Plan (WMP) aims to describe the arrangements for avoidance, minimization, handling, reuse, recovery and recycling, storage, transportation, collection, treatment and disposal of different categories of waste to be generated from the construction activities of this project. This WMP includes the recommended mitigations measures on waste management as stipulated in EIA report and EM&A Manual.

 

The main objectives of the WMP include:

(a)    Providing reference to the waste management requirements, both statutory and non-statutory;

(b)    Clarifying the responsibilities of each party on waste management and the personnel within the Contractor’s management;

(c)    Establishing the waste management procedures for avoidance, minimization, material reuse/recovery/recycling, collection, transportation, storage and disposal of wastes generated from the construction activities.

 

1.3  Environmental Management Policy

 

An Environmental Management Policy is established to demonstrate the Company’s commitment in improving environmental performance. It aims to communicate KSZHJV’s mission, vision and beliefs towards the environment to the staff and provides a framework for guiding KSZHJV’s ongoing environmental improvement efforts.

 

The policy will be reviewed by relevant parties periodically and will be displayed on notice boards in languages suitable for the nationality for the workforce.

 

The Environmental Policy Statement, together with the Environmental Objectives and Targets, are listed below:

 


 


Environmental Objectives and Targets

 

 

環境目標及指標

 

Item No.

Objective

Target

1

To comply with legal requirements

l Zero Conviction

l Zero Pink/ yellow notice

2

To satisfy client’s environmental requirements

Obtain a “satisfactory” or above ratings on the quarterly performance report

3

To prevent serious environmental incident

Zero Serious Environmental Incident

4

Maintain an effective EMS

Audit the Environmental Management System not less than twice a year

5

Enhance environmental awareness of workers

All workers to receive environmental induction training

 

環境目標及指標

 

項目.

目標

指標

1

奉公守法

l 零檢控

l 粉紅/ 環境改善通知書

2

滿足業主要求

於季度表現報告(環保項目)中取得『滿意』或以上之級別

3

防止嚴重環境事故

零嚴重環境事故

4

確保環境管理系統有效執行

每年審核環境管理系統不少於兩次

5

加強工人環保意識

所有工人接受環保入職培訓

 

1.4   The Waste Management Policy

 

To demonstrate the KSZHJV’s commitment on the continual improvement of our waste management performance, an Environmental Management Policy includes the waste management has been established. It aims to communicate KSZHJV’s waste management mission, vision and beliefs to the staff and public, it also provides a framework in guiding the project team the basic requirements to be achieved in waste management.

 

The hierarchy is illustrated below. It attempts to evaluate waste management practices and selects the best practical option since conceptually it makes sense to avoid producing waste rather than developing extensive treatment schemes. Good planning and site management practices also help minimizing over ordering or misuse of construction materials. The overall objective is to reduce and minimize the amount of wastes generated, hence reducing the costs of waste handling and disposal.

 

描述: Z:\00 WMP\Hira.gif

 

 

1.5  Regulations and Guidelines

 

1.5.1     General

 

Various types of wastes would be generated during the course of the Project and each waste types requires different approach for management and disposal as stipulated in the waste legislation and guidelines. The relevant statutory and non-statutory requirements regarding waste management are summarized in the sections below.

 

1.5.2    Statutory Requirements

 

The following legislation relates to the handling, treatment and disposal of wastes in Hong Kong, and would be observed with regard to all wastes generated and requiring disposal, where applicable:

 

l   The Waste Disposal Ordinance (Cap 354)

l   The Waste Disposal (Chemical Waste) (General) Regulation (Cap 354)

l   The Waste Disposal (Charges for Disposal of Construction Waste) Regulation (Cap 354)

l   The Land (Miscellaneous Provisions) Ordinance (Cap 28)

l   The Dumping at Sea Ordinance (Cap 466)

l   The Public Health and Municipal Services Ordinance (Cap 132) - Public Cleansing and Prevention of Nuisances (Urban Council) and (Regional Council) By-Laws

l   Summary Offences Ordinance (Cap 228)

l   Other relevant regulations

 

1.5.2.1  The Waste Disposal Ordinance (WDO)

 

The Waste Disposal Ordinance (WDO) prohibits the unauthorized disposal of waste. Construction waste is not directly defined in the WDO, but is considered to fall within the category of “trade waste.” Under the WDO, wastes can only be disposed of at sites licensed by EPD.

 

1.5.2.2  The Waste Disposal (Chemical Waste) (General) Regulation

 

Under the Waste Disposal (Chemical Waste) (General) Regulation all producers of chemical wastes (including asbestos) must register with EPD and treat their wastes either utilizing on-site plant licensed by EPD, or arranging for a licensed collector to take the wastes to a licensed facility. The regulation also prescribes the storage facilities to be provided on site, including labeling and warning signs, and requires the preparation of written procedures and training to deal with emergencies such as spillages, leakages, or accidents arising from the storage of chemical wastes.

 

1.5.2.3  The Waste Disposal (Charges for Disposal of Construction Waste) Regulation

 

The current policy related to the dumping of C&D material is documented in the Development Bureau (Works) Technical Circular No. 09/2011, ‘Enhanced Control Measures for Management of Public Fill’. Construction and demolition materials that are wholly inert, namely public fill, should not be disposed of to landfill, but taken to public filling areas, which usually form part of reclamation schemes.

Under the WDO and the Charging Regulation, wastes can only be disposed of at designated waste disposal facilities licensed by EPD. For construction work with a value of more than HK$1M, the main contractor is required to establish a billing account at EPD before transporting the construction waste to the designated waste disposal facilities (e.g. landfill, public fill etc.). The vessels for delivering construction waste to public fill reception facility would need prior approval from EPD. Breach of these regulations can lead to a fine and/or imprisonment.

 

1.5.2.4  The Land (Miscellaneous Provisions) Ordinance

 

The Land (Miscellaneous Provisions) Ordinance requires that dumping licences be obtained by individuals or companies who deliver public fill to public filling areas. The Civil Engineering & Development Department (CEDD) issues the licences under delegated powers from the Director of Lands.

 

1.5.2.5  The Public Health and Municipal Services Ordinance (Cap 132) - Public Cleansing and Prevention of Nuisances (Urban Council) and (Regional Council) By-Laws

 

The Public Cleansing and Prevention of Nuisances By-Laws provide further controls on the illegal tipping of wastes on unauthorized (unlicensed) sites.

 

1.5.2.6  Related License and permits

 

The Contractor would obtain all necessary permits and licenses under these ordinances including, but not limited to:

l   Registration as a Chemical Waste Producer under the Waste Disposal Ordinance (Cap 354);

l   Public Dumping License under the Land (Miscellaneous Provisions) Ordinance (Cap 28);

l   Registration as a Waste Producer under the Waste Disposal (Charges for Disposal of Construction Waste) Regulation (Cap 354).

l   Obtain a Dumping Permit under Dumping at Sea Ordinance

 

1.5.2.7  Dumping at Sea Ordinance

 

Dredged mud may be dumped at sea subject to permit controls under the Dumping at Sea Ordinance (DASO). Anyone who intends to dump dredged mud must first obtain a permit from the Director of Environmental Protection. Marine dumping sites have been designed for the disposal of dredged mud. All marine dumping activities must be carried out at these specified areas in accordance with the marine dumping permit.

 

1.5.3   Non-statutory Regulations

 

The following guidelines related to waste management and disposal would be adhered to during construction of the Project:

 

l   Code of Practice on the Packaging, Labelling and storage of Chemical Wastes EPD (1992);

l   Code of Practice on the Handling, Transportation and Disposal of Asbestos Waste, EPD;

l   Works Branch Technical Circular No. 12/2000, Fill Management, Works Bureau, HKSAR Government;

l   Works Branch Technical Circular No. 29/2000, Waste Management Plan, Works Bureau, HKSAR Government;

l   Environment, Transport and Works Bureau Technical Circular (Works) No. 34/2002, Management of Dredged / Excavated Sediment, Environment, Transport and Works Bureau, HKSAR Government;

l   Works Branch Technical Circular, 32/92, the Use of Tropical Hard Wood on Construction Site, Works Branch, Hong Kong Government;

l   Works Branch Technical Circular No. 2/93, Public Dumps, Works Branch, Hong Kong Government;

l   Works Branch Technical Circular No. 16/96, Wet Soil in Public Dumps, Works Branch, Hong Kong Government;

l   Works Bureau Technical Circular NO. 4/98 and No.4/98A, Use of Public Fill in Reclamation and Earth Filling Projects, Works Bureau, HKSAR Government;

l   Works Bureau Technical Circular No. 5/98, On-site sorting of Construction Waste on Demolition Site, Works Bureau, HKSAR Government;

l   Environment, Transport and Works Bureau Technical Circular (Works) No. 33/2002, Management of Construction and Demolition Material including Rock, Environment, Transport and Works Bureau, HKSAR Government;

l   Waste Reduction Framework Plan, 1998 to 2007, Planning, Environment and Lands Bureau, Government Secretariat, 5 November 1998;

l   Works Bureau Technical Circular No. 25/99, 25/99A and 25/99C, Incorporation of Information on Construction and Demolition Material Management in Public Works Sub-committee Papers, Works Burea7, HKSAR Government;

l   Development Bureau (Works) Technical Circular No. 6/2010, Trip Ticket System for Disposal of Construction and Demolition Materials

l   Development Bureau (Works) Technical Circular No. 8/2010, Enhanced Specification for Site Cleanliness and Tidiness;

l   Development Bureau (Works) Technical Circular No.2/2011, Encouraging the Use of Recycled and other Green Materials in Public Works Projects

l   Development Bureau (Works) Technical Circular No. 9/2011, Enhanced Control Measures for Management of Public Fill;

l   A Guide to the Registration of Chemical Waste Producers; and

l   A Guide to the Chemical Waste Control Scheme.

 

 

 

 

 

2        SITE ORGANIZATION AND STAFF DUTIES

 

2.1  Organization Structure

 

The organization structure for waste management is outlined in Figure 2.1. This chart outlines the overall site management in relation to waste management and environmental issues. Details on the roles and responsibilities of staffs responsible for implementation of the waste management plan are outlined below.

 

 

Figure 2.1: The Organizational Structure for Waste Management

 

2.2 Roles and Responsibilities

 

KSZHJV has appointed the Environmental Monitoring Manager as the senior staff member fully responsible for implementing and overseeing the operation of the Trip Ticket System. The General Foremen and Foremen are appointed to man each exit from the Site for the purpose of ensuring that every truck / barge carrying C&D materials leaving the Site bears a duly completed, signed and stamped CHIT ticket / Vessel CHIT respectively.

 

2.2.1 Managing Director (Head Office)

 

l   Having corporate responsibility for the environmental protection;

l   To formulate and endorse the Environmental Policy; and

l   To ensure adequate resources are available for implementation, control and improvement of the Environmental Management System.

2.2.2 Project Director (Head Office)

 

l   Ensure that an effective Environmental Management System is established, implemented and maintained;

l   To report the overall environmental performance to the Managing Director or the management board;

l   To be the chairman of the Company Environmental Management Committee;

l   Taking the lead to promote environmental protection generally whenever opportunities arise both internally and externally; and

l   To ensure adequate resources are available for implementation, control and improvement of the Environmental Management System.

 

2.2.3 Project Manager (PM)

 

The Project Manager has responsibility for coordinating all environmental matters and reporting on these to the KSZHJV Supervisory Board and is responsible for all aspects of environmental issues within the project, which are managed with the Waste Management Plan (WMP).

 

The Project Manager is also responsible for ensuring commitment and assigning resources to provide an effective environmental management program in the workplace. The Project Manager will also attend the Site Safety and Environmental Management Committee Meeting and the Site Safety and Environmental Committee Meeting.

 

2.2.4 Construction Manager (CM)

 

The responsibilities of the Construction Manager are as follows:

 

l   Ensure works are executed in accordance with the WMP (Waste Management Plan).

l   Arrange routine joint site inspection with Environmental Monitoring Manager when necessary and review environmental inspection report submitted by Environmental Monitoring Manager.

l   Ensure appropriate environmental protection and pollution control mitigation measures are properly implemented in accordance with the relevant procedures.

l   Assist in handling any complaints received from the public.

l   Ensure remedial action to be taken immediately if there is a non-compliance of statutory or contractual requirements in respect of environmental protection issues.

l   Attend Site Safety and Environmental Management Committee Meeting (SSEMC) and the Site Safety and Environmental Committee Meeting (SSEC).

 

2.2.5 Environmental Monitoring Manager

 

We shall assign a person with sufficient qualification as an Environmental Monitoring Manager. The Environmental Monitoring Manager will provide advice to project management in respect of any environmental protection issues including noise abatement, air pollution control, water pollution control, and refuse disposal etc.

 

The Project Manager with the assistance of the Environmental Monitoring Manager would assume environmental duty on site. In other words, the project management is held responsible for any matter arising out of and in relation to environmental practices adopted on site.

 

The Environmental Monitoring Manager will work in parallel with the design team, project management and environmental team to ensure environmental issues are fully considered during the design and implementation stages.

 

The Environmental Monitoring Manager will also be responsible for the following:

 

l   Prepare, implement and update the Waste Management Plan;

l   Advise on measures to be taken in the interest of environmental protection, and implement such measure;

l   Liaise on all matters relating to environmental monitoring and auditing;

l   Carry out inspections of the Site for identifying potential hazards to the environmental, and to report findings with recommendations for corrective actions;

l   Participate in the weekly environmental walks with the Supervising Officer Representative (SOR) and environmental team to monitor the environmental performance on the Site;

l   Check and ensure that any polluting or potentially polluting situation is promptly rectified;

l   Attend Site Safety and Environmental Management Committee (SSEMC) meetings and Site Safety and Environmental Committee (SSEC) meetings;

l   Arrange and provide the environmental training including the site specific induction training and toolbox talks for the staff and workers on the Site, and to organize environmental promotional activities;

l   Advise the company on the implementation of an environmental management system;

l   Keep a copy of the following documents (including but not limited to):

l   Any statutory required environmental permits/licenses including construction noise permits, noise labels for compressors and hand held percussive breakers, effluent discharge licenses, dumping permits, chemical waste producer;

l   All correspondences with Environmental Protection Department (EPD) and complaints;

l   Records regarding the handling of contaminated wastes;

l   Records regarding the disposal of all construction and demolition materials to the public filling areas and landfills, i.e. trip tickets and chits;

l   Record of all trained personnel in the site offices and update the record

l   Update the monthly summary Waste Flow Table (WFT);

l   Report to the Project Manager regarding non-compliance of any environmental protection issues and ensure any non-compliance is handled;

l   Advise emergency actions or alternative arrangements when monitoring results show exceedances of Limit and Action levels;

l   Ensure complaints are handled properly; and

l   Co-ordinate with the Environmental Team and the Supervising Officer Representative to ensure all environmental issues are properly handled.

l   Attend Site Safety and Environmental Management Committee Meeting and the Site Safety and Environmental Committee Meeting.

 

2.2.6 Environmental Officer (EO) / Environmental Supervisor(s) (ES)

 

The KSZHJV shall assign a person with sufficient qualification as an Environmental Officer / Environmental Supervisor. The duties of the Environmental Officer / Environmental Supervisor shall, for the purpose of environmental management under the Contract, include but without limitation to the followings:

 

l   Assist the Environmental Monitoring Manager carrying out his/her duties;

l   Carry out inspections of the environmental protection works for which he is responsible, and to ensure that follow-up actions have been taken promptly against defects and deficiencies identified;

l   Advise the Environmental Monitoring Manager on the upkeeping of environmental performance and standards of the Site;

l   Attend the weekly environmental walk if required;

l   Supervise and promote the execution of environmental work by the workers on the Site;

l   Attend Site Safety and Environmental Management Committee meetings and Site Safety and Environmental Committee meetings;

l   Conduct toolbox talk as assigned by the Project Manager / Environmental Monitoring Manager after acquiring the necessary qualifications;

l   Report to Environmental Monitoring Manager; and

l   Perform the duty of Environmental Monitoring Manager when he/she is absent.

l   Attend Site Safety and Environmental Management Committee Meeting and the Site Safety and Environmental Committee Meeting.

 

2.2.7 Superintendent / Site Engineers / Assistant Engineers

 

The Superintendent/ Site Engineers / Assistant Engineers have the following duties in relation to environmental control:

 

l   Monitor and control the works including those of sub-contractors to ensure compliance of both contractual and statutory requirements;

l   Report to the Project Manager and Construction Manager(s) regarding non-compliance of any environmental protection issues;

l   Investigate and verify the complaint received from public;

l   Ensure the remedial actions or mitigation measures are carried out as planned and;

l   Carry out noise and vibration monitoring as required.

l   Attend Site Safety and Environmental Committee Meeting.

 

2.2.8 Foremen

 

Foremen are responsible for the following duties in relation to environmental control:

 

l   Control the works, including those of sub-contractors, to fulfill environmental protection requirements;

l   Report to the Site Engineers/ Assistant Engineers any non-compliance of environmental protection and mitigation measures;

l   Investigate the complaint received from public; and

l   Carry out remedial actions or mitigation measures to rectify the non-compliance.

l   Attend Site Safety and Environmental Committee Meeting.

 

The foreman will also act as a ticket issuer which is responsible for issuing both “Disposal Delivery Form (DDF)” under trip ticket system and “CHIT” / “Vessel CHIT” under the Disposal Charging Scheme. He is responsible for checking the following items before issuing the tickets:

l   The size of the inert Construction and Demolition (C&D) material is less than 250mm;

l   The proper sorting of the construction waste that no public fill is mixed with Construction and Demolition waste before disposal;

l   No overloading of the dump truck;

l   Ensure the coverage of the cover of dump truck.

 

He has the authority not to issue the tickets if any one of the above list requirements is not complied and directly reported to Environmental Monitoring Manager / Environmental Officer / Environmental Supervisor.

 

2.2.9 Subcontractors

 

Subcontractors are responsible for the following duties in relation to environmental control:

 

l   Implementing environmental control measures according to the KSZHJV’s waste management plan and instructions given by its staff;

l   Submitting relevant environmental information to the main contractor where required, such as reports, method statements and environmental related records such as CHIT record, etc.

l   To ensure their activities are carried out in an environmental control manner and complied with both contractual and legal requirements;

l   Supervising their workers to observe environmental rules and regulations,

l   To arrange and release workers to attend environmental training where appropriate; and

l   Reporting environmental related accidents, incidents, emergency situations to main contractor’s staff promptly.

 

2.2.10 Other staffs / Workers

 

l   Co-operating with his/her proprietor and environmental personnel and supervisor, to enable them to comply with or to perform duties and responsibilities for environmental protection at work;

l   Observe environmental rules and regulations.

 

2.2.11 Environmental Team (ET)

 

The ET has been employed by the KSZHJV and shall be responsible to conduct the (Environmental Monitoring and Audit) EM&A programme. The ET shall be managed by the ET Leader, who shall be a person who has at least 7 years’ experience in EM&A and have relevant professional qualifications. Suitably qualified staff should be included in the ET, and resources for the implementation of the EM&A programme have been allocated by the KSZHJV to enable fulfillment of the Project’s EM&A requirements as specified in the EM&A Manual during construction and operation of the Project. The ET shall report to the Supervising Officer and the duties of ET shall include the following:

 

l Monitor and audit various environmental parameters as required in this EM&A Manual.

l Analyse the environmental monitoring and audit data and review the success of EM&A programme to cost-effectively confirm the adequacy of mitigation measures implemented and the validity of the EIA predictions and to identify any adverse environmental impacts arising.

l Carry out regular site inspection to investigate and audit the KSZHJV’s site practice, equipment and work methodologies with respect to pollution control and environmental mitigation, and effect proactive action to pre-empt problems.

l Monitor compliance with conditions in the EP, environmental protection, pollution prevention and control regulations and contract specifications.

l Audit environmental monitoring data and site environmental conditions.

l Report on the environmental monitoring and audit results to EPD, the Supervising Officer, the IEC and KSZHJV or their delegated representative.

l Recommend suitable mitigation measures to the KSZHJV in the case of exceedance of action or limit levels in accordance with the event and action plans.

l Liaise with the IEC on all environmental performance matters and timely submit all relevant EM&A proforma for approval by the IEC.

l Advise the KSZHJV on environmental improvement, awareness, enhancement matters, etc. on site.

l Adhere to the procedures for carrying out complaint investigation.

l Timely submit the EM&A Reports to EPD

 

2.2.12 Independent Environmental Checker (IEC)

 

The IEC has been employed by the KSZHJV. The responsibilities of the IEC during the construction and operation of the Project shall include the following:

l Advise the Supervising Officer on environmental issues related to the project, independent from the management of construction works, but empowered to audit the environmental performance of construction and operation of the IWMF.

l Provide proactive advice to the Supervising Officer and the Employer of the Project on environmental matters.

l Review and audit all aspects of the EM&A programme, including the implementation of environmental mitigation measures, submission relating to the EP and EM&A, and any other submission required under the EP and EM&A Manual.

l Review and verify the monitoring data and all submissions relating to or under the EP and EM&A Manual submitted by the ET, including but not limited to the EM&A reports

l Monitor the implementation of the EM&A programme and the overall level of environmental performance being achieved.

l Arrange and conduct regular, at least monthly site inspections of the works during construction phase, and ad hoc inspections if significant environmental problems are identified.

l Comply with the agreed event / action plan in the event of any exceedance.

l Check and ensure the procedures for carrying out complaint investigation being followed and check the effectiveness of corrective measures.

l Feedback audit results to ET by signing off relevant EM&A proforma.

l Ensure the impact monitoring is conducted at the correct locations at the frequency identified in the EM&A Manual.

l Check that the mitigation measures are effectively implemented.

l Report the works conducted, the findings, recommendation and improvement of the site inspections, the findings, recommendation, and improvement after reviewing the ET’s and the KSZHJV’s works, and any advices to the Supervising Officer and the Employer of the Project on a monthly basis.

 

 

 

 

 

 

3        SITE SPECIFIC WASTE MANAGEMENT

 

3.1  Waste Policy Principles

 

Refer to hierarchy abovementioned in Section 1.4, a further explanation of the hierarchy of waste management on site is detailed below.

 

3.1.1  Hierarchy of Waste Management

 

Key to waste management is to reduce the amount of waste generated from the work site. Waste management options would be exercised in accordance with the hierarchy stipulated in the following table:

Avoidance and Minimization

Avoid and minimize waste through careful planning and design works.

Reuse

Reuse construction waste such as excavated material, used wooden plants and ferric materials.

Recovery and Recycle

Undertake on-site or off-site waste recycling.

Treatment and Disposal

Properly treat and dispose of waste in accordance with legislative requirements, guidelines and good practices.

Table 1: Hierarchy of Waste Management

 

In the context of waste reduction, environmentally responsible purchasing would involve the introduction of practices that discourage unnecessary purchases and encourage the purchase of products with reduced packaging, increased durability and materials with high recycled content, such as, recycled paper, steel and other raw construction materials.

 

Waste minimization is best achieved through careful planning, design and supervision. Good management practices would reduce and prevent large amount of waste generated. Raw materials would be managed from the first instance before they are ordered and delivered to the site. Good estimation and planning would minimize the amount of raw materials wasted. The generation of waste would be controlled at source.

 

3. 2  Waste Reduction

 

Specific measures will be implemented to reduce the generation of waste materials, and thus minimize the amount of waste disposal to landfills. The measures will include:

 

l   Sorting on site to recover the inert portion of C&D materials;

l   Sorting of plastic waste and deliver to recycling company;

l   Recover all metallic waste for recycling;

l   Recover all cardboard and paper packaging, and properly stockpile them in dry and covered condition to prevent cross contamination;

l   Use of the materials (such as formworks and hoardings) in the construction would be calculated before purchasing in order to minimize waste generation.

l   Use of metal formworks and hoardings, and they would be recycled after demolition on site as far as it can before disposal.

 

 

 

 

 

4   WASTE MANAGEMENT PROCEDURE

 

The quantities of disposal C&D materials will be recorded under the barcode trip ticket system by using the “C&D Material Disposal Delivery Form”. In addition, the filled “CHIT” / Vessel “CHIT” will also be presented to the landfill / public fill site as part of the system for the disposal charging scheme which had already been officially effective in January 2006. Waste transaction records could be obtained either in the waste disposal facilities right after the transaction or retrieved from the EPD bill statement each month.

 

According to our latest site investigation results, all the boreholes were found to have a very low organic matter. It is therefore not anticipated to have biogas generation. In addition, the specifications of the project are not required to have any precautions during construction works. It is also not anticipated to use public fill for reclamation below +2.5mPD.

 

Borehole No.

Depth (m)

Organic Matter (%)

VC10

0.0 – 0.9

1.3

VC10

12.9 – 13.9

0.5

VC3

0.0 – 0.9

1.5

VC3

13.9 – 14.9

3.6

VC4

0.9 – 1.9

1.3

VC4

10.9 – 11.9

4.6

VC9

0.0 – 0.9

0.5

VC9

10.9 – 11.9

1.0

Table 2: Organic matter of the boreholes

 

4.1 Estimate Quantities of C&D Materials / Wastes

 

The following types of waste would be generated from the works.

l   Inert C&D materials (Removal of Surcharge);

l   Inert C&D materials (Broken concrete);

l   Non inert C&D materials;

l   Marine Sediment;

l   Chemical waste;

l   General refuse; and

l   Recyclable wastes (paper, plastic and metal)

 

Material

Generated from Project (m3)

Re-used onsite or on other Projects (m3)

Disposal (m3)

Proposed Disposal Outlet

Inert C&D Materials (Removal of Surcharge)

532,000

212,800

319,200

Alternative Disposal Ground to be approved by SOR, Tuen Man Area 38, TKO Area 137

Inert C&D Materials

(Excavated alluvium / rock)

50,000

50,000

0

 

Non inert C&D Materials

8,000

3,000

5,000

North East New Territories Landfill

Marine Sediment

27,300

0

27,300

South of Cheung Chau

Sewage

1,000

0

1,000

Licensed Contractor

Chemical Waste

5,000 (L)

0

5,000 (L)

Licensed Chemical Waste Collector

Recyclable wastes (paper, plastic, metal)

50

50

0

On list EPD waste collector

Table 3: Estimated Quantities of C&D Materials and Proposed Disposal Outlet

 

4.2  Acceptance Criteria for the Government Disposal Facilities

 

Inert C&D materials shall dispose to Fill Banks (e.g. Tuen Mun Area 38, TKO Area 137 etc.) Mixing of non inert C&D materials with inert C&D materials will result in rejection for disposal of C&D materials at Fill Banks.

 

For non-inert C&D materials, the designated disposal facility is depended on the waste depth / weight ratio of the vehicle to transport the non-inert C&D materials off site.

Vehicle Type

Waste Depth

Weight Ratio (note)

Designated Facility

Non-demountable Vehicle

Over 1.5m

No restriction

Landfill

1.5m or below

0.20 or below

Over 0.20

Sorting Facility

Demountable Vehicle

Over 1m

No restriction

Landfill

1m or below

0.25 or below

Over 0.25

Sorting Facility

Table 4: Waste Acceptance Criteria for landfill and sorting facilities for non inert C&D Materials

Note: Weight ratio = The net weight of C&D materials / Permitted Gross Vehicle Weight

 

KSZHJV will comply with the acceptance criteria laid down by the operators of the corresponding fill bank(s) and landfill(s), as outlined below:

 

4.2.1  Acceptance Criteria for Fill Banks (Tuen Mun Area 38 Fill Bank or Tseng Kwan O Area 137 Fill Bank)

 

l   The Truck Driver should bear a duly completed, signed and stamped DDF and a duly signed CHIT;

l   The dump truck should also have a valid Dumping License issued by CEDD, dump trucks without Dumping Licenses will be rejected;

l   The inert C&D materials to be delivered to the fill bank(s) should be in accordance with the conditions stipulated in the Dumping License;

l   Any over-sized inert C&D materials should be broken down to less than 250mm in size so as to facilitate its reuse by other reclamation or earth-filling projects;

l   The C&D materials to be disposed should consist entirely of inert construction waste (i.e. 100% inert construction waste); and

l   the bituminous material is required to be separated from other inert construction and demolition (C&D) materials for disposal prior to delivery to the Public Fill Reception Facility (PFRF).

 

4.2.2  Acceptance Criteria for NENT Landfill (Northeast New Territories Landfill)

 

l   The Truck Driver should bear a duly completed, signed and stamped DDF and a duly signed CHIT;

l   The dump truck should also have a valid Dumping License issued by CEDD, dump trucks without Dumping Licenses will be rejected;

l   The non-inert C&D waste to be delivered to the landfills should be in accordance with the conditions stipulated in the Dumping License;

l   Construction waste containing not more than 50% by weight of inert C&D waste (Gazette Notice G.N. 4272 published on 27 June 2008);

l   For a load of C&D waste not consisting entirely of bamboo, plywood or timber delivered by a vehicle, the weight of the waste divided by the permitted gross vehicle weight of the vehicle must not greater than 0.25 for goods vehicle with demountable skip and 0.2 for other types of vehicle (Gazette Notice G.N. 4272 published on 27 June 2008);

l   Mixed C&D materials should be sorted at source to reduce the inert content as far as practicable to meet the above criteria before they are delivered to landfills;

l   C&D waste delivered for landfill disposal should contain no free water and the liquid content will not exceed 70% by weight; and

l   At least one week’s notice, including contractors name and contact details etc, will be submitted to the EPD before starting to deliver the C&D waste to the landfills. EPD will be informed of any subsequent change to the disposal programme.

 

4.3  Procedures of the Trip Ticket System (Disposal of C&D materials from Portion 7)

 

Portion 7 is generally used for the storage of Site Investigation Bore log samples inside the container and may tentatively use as bar bending yard in future. No construction wastes will be transported from the Artificial Island at Shek Kwu Chau to Portion 7.

 

KSZHJV will implement a Trip Ticket System (TTS) to track the disposal of C&D materials. Under the TTS, each truck carrying C&D materials leaving the Site for a disposal ground will bear a duly completed and stamped Disposal Delivery Form (DDF) issued by the Supervising Officer’s Representative. The C&D materials must be disposed of at the disposal grounds as stipulated in the DDF.

 

The Trip Ticket System will be executed according to the following procedures:

 

l  The Superintendents/ Senior Foremen/ Foremen will arrange the C&D waste to be sorted on site. He will also check the total actual amount of accumulated C&D materials.

l  Non-inert C&D materials will be stored in storage tanks properly covered with tarpaulin sheeting. Inert C&D materials shall be properly covered with tarpaulin sheeting. Larvicidal oil or larvicide will be applied onto the stored C&D waste, if necessary.

l  For each truckload of C&D materials leaving Tung Chung Storage area to the designated Fill Banks / landfills, the truck driver must bear a duly completed and a duly signed CHIT.

l  The truck will proceed to the disposal ground as stipulated in the CHIT. The truck driver will present the CHIT to the reception facility operator. If the C&D materials accords with the acceptance criteria, disposal of the C&D materials will be permitted and the facility operator will give the truck driver a transaction receipt and stamp the CHIT.

l  The truck driver will present the CHIT at the in-weight bridge officially. If the vehicle load is accepted, the CHIT is deemed to be used and the in-weight would be recorded on the “Transaction Record Slip”.

l  If the truck driver was instructed by the reception facility operator to go to the sorting facility. The driver will need return back to the site and report to the Superintendents/ Senior Foreman/ Foremen. No driver is allowed to go to sorting facility without Superintendent/ Senior Foreman/ Foremen permission or instruction.

l  The truck driver will then return the transaction receipt and the stamped CHIT to KSZHJV as soon as possible. All CHITs are to be return to the Environmental Monitoring Manager.

l  KSZHJV will maintain a daily record disposal of C&D materials from the Site including details of the C&D materials, the truck number, departure time, etc., and should check against the Supervising Officer’s Representative records as soon as possible and notify the Supervising Officer’s Representative in case any discrepancy is noted.

l  A daily record of disposal of C&D materials from the Site will be maintained, the record includes the details of the C&D materials, the truck number, departure time, etc., using the Daily Record Summary (DRS).

l  The duly completed Part 1 of the DRS before departure of the vehicle, or to suit site operations at other time to be agreed between the Supervising Officer’s Representative.

l  For disposal at government disposal facilities, KSZHJV will check the information recorded in the DRS against the disposal records in CEDD’s website (http:www.cedd.gov.hk/eng/services/tripticket/index.html) or EPD’s website (http://www.epd.gov.hk/epd/misc/cdm/trip.htm) and complete Part 2 of the DRS for submission to the Supervising Officer within 1 working day after the records are posted at the EPD web site.

l  Where an irregularity is observed or where requested by the Supervising Officer’s Representative under special circumstances (e.g. a CHIT has been issued but there is no disposal record at the designated disposal facilities), KSZHJV will submit to the Supervising Officer’s Representative within 5 working days after the recorded date of disposal the supporting evidence such as duly stamped CHIT and/or the transaction receipt (where relevant) to confirm proper completion of the delivery trips in question, or within 2 working days after the Supervising Officer’s Representative has requested for such evidence, whichever is later. A fax copy of the CHIT and transaction receipt is acceptable, unless otherwise directed by the Supervising Officer.

KSZHJV will maintain all records on the CHIT for at least one year or other period as may be directed by the Supervising Officer’s Representative. The proposed days for reporting any irregularity found shall be subject to review from time to time.

 

4.4 Procedures of the Trip Ticket System (Vessel to land: Disposal of non inert C&D materials from Artificial Island at Shek Kwu Chau to landfills)

 

The Trip Ticket System will be executed according to the following procedures:-

l   The Superintendents/ Senior Foremen/ Foremen will arrange the C&D materials to be sorted on site. He will also check the total actual amount of accumulated C&D materials after the completion of the particular works in the working area.

l   Non-inert C&D materials will be stored in storage skips properly covered with tarpaulin sheeting. Larvicidal oil or larvicide will be applied onto the stored C&D materials, if necessary.

l   When accumulating sufficient amount of non inert C&D materials, the storage skips shall be transported by barge to the berthing area of Tuen Mun Area 38 Temporary Construction Waste Sorting Facility which the main contractor of that project is China Harbour Engineering Co. Ltd. Approval shall be obtained from the Engineer’s Representative of the project – Tuen Mun Area 38 Temporary Construction Waste Sorting Facility.

l   If Tuen Mun Area 38 Temporary Construction Waste Sorting Facility is not feasible to act as the berthing point to transfer non inert C&D materials from vessels to trucks, KSZHJV shall apply for the necessary permission and licenses from the appropriate authorities for the berthing point to transfer non inert C&D materials from vessels to trucks;

l   Prior to transferring the storage skips to the barge, the Superintendents/ Senior Foremen/ Foremen shall issue an internal trip ticket of each storage skips to vessel master for transferring non inert C&D materials from vessels to land;

l   All non inert C&D materials loaded off from the barge shall immediately transfer to the dump truck in form of storage skips only. No non inert C&D materials shall be stored within the construction site at Tuen Mun Area 38 Temporary Construction Waste Sorting Facility;

l   The Superintendents/ Senior Foremen/ Foremen shall issue CHIT in exchange of the issued internal trip ticket for each storage skips at Tuen Mun Area 38 Temporary Construction Waste Sorting Facility;

l   For each truckload of Non inert C&D materials leaving Tuen Mun Area 38 Temporary Construction Waste Sorting Facility to the designated landfills, the truck driver must bear a duly completed and a duly signed CHIT.

l   The truck will proceed to the disposal ground as stipulated in the CHIT. The truck driver will present the CHIT to the reception facility operator. If the C&D waste accords with the acceptance criteria, disposal of the C&D waste will be permitted and the facility operator will give the truck driver a transaction receipt and stamp the CHIT.

l   The truck driver will present the CHIT at the in-weight bridge officially. If the vehicle load is accepted, the CHIT is deemed to be used and the in-weight would be recorded on the “Transaction Record Slip”.

l   If the truck driver was instructed by the reception facility operator to go to the sorting facility. The driver will need return back to the site and report to the Superintendent/ Senior Foreman/ Foremen. No driver is allowed to go to sorting facility without Superintendent/ Senior Foreman/ Foremen permission or instruction.

l   The truck driver will then return the transaction receipt and the stamped CHIT to KSZHJV as soon as possible. All CHITs are to be return to the Environmental Monitoring Manager.

l   KSZHJV will maintain a daily record disposal of C&D materials from the Site including details of the C&D materials, the truck number, departure time, etc., and should check against the Supervising Officer’s Representative records as soon as possible and notify the Supervising Officer’s Representative in case any discrepancy is noted.

l   A daily record of disposal of C&D materials from the Site will be maintained, the record includes the details of the C&D materials, the truck number, departure time, etc., using the Daily Record Summary (DRS).

l   The duly completed Part 1 of the DRS before departure of the vehicle, or to suit site operations at other time to be agreed between the Supervising Officer’s Representative.

l   For disposal at government disposal facilities, KSZHJV will check the information recorded in the DRS against the disposal records in CEDD’s website (http:www.cedd.gov.hk/eng/services/tripticket/index.html) or EPD’s website (http://www.epd.gov.hk/epd/misc/cdm/trip.htm) and complete Part 2 of the DRS for submission to the Supervising Officer within 1 working day after the records are posted at the EPD web site.

l   Where an irregularity is observed or where requested by the Supervising Officer’s Representative under special circumstances (e.g. a CHIT has been issued but there is no disposal record at the designated disposal facilities), KSZHJV will submit to the Supervising Officer’s Representative within 5 working days after the recorded date of disposal the supporting evidence such as duly stamped CHIT and/or the transaction receipt (where relevant) to confirm proper completion of the delivery trips in question, or within 2 working days after the Supervising Officer’s Representative has requested for such evidence, whichever is later. A fax copy of the CHIT and transaction receipt is acceptable, unless otherwise directed by the Supervising Officer. KSZHJV will maintain all records on the CHIT for at least one year or other period as may be directed by the Supervising Officer’s Representative. The proposed days for reporting any irregularity found shall be subject to review from time to time.

The above procedure follows the policy set out in the Works Bureau Technical Circular No.6/2010 – “Trip-ticket System for Disposal of Construction and demolition Material”.

 

4.5 Procedures of the Trip Ticket System (Vessel disposal: Disposal of inert C&D wastes from Artificial Island at Shek Kwu Chau to Fill Banks)

 

For vessels disposal, KSZHJV will implement the aforesaid Trip Ticket System (TTS) to monitor the disposal of C&D materials with the “Application for Vessel to be approved for Delivering Inert Construction Waste to Public Fill Reception Facilities” in advanced. Vessel CHIT shall be applied by KSZHJV. The detail procedure and requirement of the application process is shown in Appendix C.

The Trip Ticket System will be executed according to the following procedures:-

l   The Superintendents/ Senior Foremen/ Foremen will arrange the C&D materials to be sorted on site. He will also check the total actual amount of accumulated C&D materials after the completion of the particular works in the working area.

l   Inert C&D materials will be stored in designated area within Artificial Island at Shek Kwu Chau properly covered with tarpaulin sheeting. Larvicidal oil or larvicide will be applied onto the stored C&D waste, if necessary.

l   When accumulating sufficient amount of inert C&D materials, CEDD shall be informed by the proposed date of inert waste disposal and vessel license No. at least 1 day in advance. After confirmation with CEDD on the disposal date, inert C&D materials shall be grabbed from designated storage area within Artificial Island to hopper barge.

l   A vessel CHIT should be duly signed by representative of KSZHJV, and delivered to Vessel Master and all the required information such as “Prescribed Facility”, “Date of Use”, “Issued by” and “Vessel License No.” shall be completed clearly in the appropriate space provided on the Vessel CHIT. A Vessel CHIT is only valid for vessel License No. as shown on the Vessel CHIT.

l   On arrival at the mooring of the prescribed facility, Tuen Mun Area 38, the Vessel Master shall present the Vessel CHIT and report to the Officer-in-charge of the prescribed facility.

l   Vessel Master shall keep Part A of the Vessel CHIT and present Parts B and C of the vessel CHIT to the facility operator.

l   Facility operator shall stamp the vessel CHIT and return Part C of the vessel CHIT to Vessel Master.

l   The Vessel Master will then return the stamped Vessel CHIT to KSZHJV as soon as possible. All Vessel CHITs are to be return to the Environmental Monitoring Manager.

l   KSZHJV will maintain a daily record disposal of C&D materials from the Site including details of the C&D waste, the vessel license No., departure time, etc, and should check against the Supervising Officer’s Representative records as soon as possible and notify the Supervising Officer’s Representative in case any discrepancy is noted.

l   A daily record of disposal of C&D materials from the Site will be maintained, the record includes the details of the C&D materials, the Vessel License No., departure time, etc., using the Daily Record Summary (DRS);

l   Where an irregularity is observed or where requested by the Supervising Officer’s Representative under special circumstances, KSZHJV will submit to the Supervising Officer’s Representative within 5 working days after the recorded date of disposal the supporting evidence such as duly stamped Vessel CHIT to confirm proper completion of the delivery trips in question, or within 2 working days after the Supervising Officer’s Representative has requested for such evidence, whichever is later. A fax copy of the Vessel CHIT is acceptable, unless otherwise directed by the Supervising Officer. KSZHJV will maintain all records on the Vessel CHIT for at least one year or other period as may be directed by the Supervising Officer’s Representative. The proposed days for reporting any irregularity found shall be subject to review from time to time.

 

4.6  Measures to be implemented during transportation of wastes to avoid leakage of wastes on public areas

 

l   All of the dump trucks used would be equipped with mechanical covers in which maintained in a good condition.

l   In order to minimize the leaking of material from the dump trucks, no material should be stored higher than the trail board.

l   Deposited silt and wastes on all dump trucks’ wheels and bodies should be properly washed off by wheel washing facilities before leaving the constructions sites.

l   KSZHJV will provide wheel washing facilities on site at the site entrance.

 

4.7  Disposal of C&D Materials to Alternative Disposal Ground(s)

 

Where KSZHJV has identified a project that can be an alternative disposal ground, KSZHJV shall strictly comply with the procedures as stipulated in the Development Bureau Technical Circular (Works) No. 6 / 2010 “Trip Ticket System for Disposal of Construction and Demolition Materials” (DEVB TC(W) No.6/2010). According to the DEVB TC(W) No.6 / 2010, KSZHJV will provide a detailed description of the alternative disposal ground, including location, lot number (where appropriate) and location plan(s) to the Supervising Officer to request for his written approval.

 

Where the alternative disposal ground is a private construction project, KSZHJV will submit a letter from the Authorized Person of the development (as defined under the Building Ordinance) to confirm that:

 

l   The C&D materials for use in the development is acceptable;

l   The use of land so formed by the C&D materials is in conformity with the statutory town plan/ lease conditions;

l   The Supervising Officer’s Representative are allowed to enter the alternative ground to conduct inspection where necessary; and

l   The estimated quantity and type of C&D materials to be used in the construction works and the approximate delivery programme, together with the name, post and specimen signature of the competent person to sign the DDF / internal trip ticket stipulated in G.S. Clause 25.25(6)(a)(ii).

 

Where the alternative disposal ground is a private land but not a construction site, KSZHJV will submit a letter from the relevant authorities, such as the Lands Department and the Planning Department, to confirm that the suitability of the alternative disposal ground in receiving the proposed amount of C&D materials for use, and a written consent from the landowner.

 

Where the alternative disposal ground is a government project, KSZHJV will submit written consent from the project office of the alternative disposal ground to use the C&D materials generated from the Site, and to confirm the estimated quantity and type of C&D materials required and the approximate delivery programme.

 

A system for transmitting disposal records from the alternative disposal ground will be submitted to the Supervising Officer’s Representative for approval before disposal to the alternative ground starts.

 

4.8  Chemical Waste/ Hazardous Waste Handling and Disposal

 

4.8.1  Chemical Waste Handling and Disposal

 

Chemical waste that is produced, as defined by Schedule 1 of the Waste Disposal (Chemical Waste) (General) Regulation, will be handled in accordance with the Code of Practice on the Packaging, Labelling and Storage of Chemical Wastes as follows:

 

Packaging

Chemical waste will be packed and held in containers of suitable design and construction so as to prevent leakage, spillage or escape of the contents under normal conditions of handling, storage and transport.

Containers used for the storage of chemical wastes will:

l   Be suitable for the substance they are holding, resistant to corrosion, maintained in a good condition, and securely closed;

l   Have a capacity of less than 450 litres unless the specifications have been approved by the EPD; and

l   Display a label in English and Chinese in accordance with instructions prescribed in Schedule 2 of the Regulations.

 

Labelling

Every container of chemical waste will bear an appropriate label which will contain the particulars details. The waste producer will ensure that the information contained on the label is accurate and sufficient so as to enable proper and safe handling, storage and transport of the chemical waste. 

 

Storage

The storage area, with height less than 2m, will be specially constructed and bunded, and located close to the source of waste generation.

The storage area for chemical wastes will:

l   Be clearly labelled and used solely for the storage of chemical waste;

l   Be enclosed on at least 3 sides;

l   Have an impermeable floor and bunding of sufficient capacity to accommodate 110% of the volume of the largest container or 20% of the total volume of waste stored in that area, whichever is the greatest;

l   Have adequate ventilation;

l   Be covered to prevent rainfall entering (water collected with the bund must be tested and disposed of as chemical waste); and

l   Be arranged so that incompatible materials are adequately separated.

 

Before reaching 80% capacity of the storage container, licensed waste collectors will be employed to remove the chemical waste.

 

Transportation and Disposal

After the chemical wastes have been packed, labelled, and stored, the chemical wastes will be transported by licensed waste collectors and disposed of at Chemical Waste Treatment Facility in Tsing Yi or other approved facilities.

 

4.9  General Refuse

 

4.9.1  Handling the General Refuse

 

Measures to be implemented to encourage waste avoidance/ minimization include:

 

l   Reducing the number of photos copies to a minimum and by copying on both sides of paper for internal documents and external documents where appropriate;

l   Preventing over-ordering of office equipment and consumables;

l   Procuring green office equipment and consumables in terms of energy efficiency, recycled content and durability, etc.;

l   Deploying sufficient recycle bins in site offices to facilitate collection of recyclables including wasted aluminum cans, plastics bottles and papers;

l   Deploying sufficient collection bins with cover at convenient locations at site to facilitate collection of non-recyclable for disposal at landfills; and

l   General refuse generated from working vessels and barges can dispose the waste into temporary waste collection point.

 

4.9.2  Handling of Sewage

 

For sewage collection will be stored by holding tank to be pumped out at regular interval and ensuring no adverse water impacts by contracting with licensed contractors to collect sewage and maintain the facilities.

 

Handling of sewage in terms sewage generated by human, adequate chemical toilets would be provided for collection.

 

Sufficient numbers of chemical toilets for workers and frontier workforces shall be placed on site.

 

4.9.3  Use of Timber

 

KSZHJV aims to avoid, reduce or minimize the use of timber in temporary construction activities. Where the use of timber is unavoidable for temporary works construction processes or activities with an estimated quantity of greater than 5m3, KSZHJV will submit a method statement to the Supervising Officer Representative for agreement before starting the relevant temporary works. The method statement will include the justifications for the use and the measures taken to minimize the use of timber.

 

The summary table of timber usage will be updated and submitted to the Supervising Officer Representative for monitoring and review by not later than the 15th day of each month or, if it is a general holiday, the day following the general holiday, or a day agreed upon with the Supervising Officer Representative.

 

4.10  Handling of Recyclables

 

Before starting the transportation of recyclable materials off site to recycling facilities, KSZHJV will meet with recycling contractors to establish a suitable system for collecting recyclable materials with care.

 

4.11  Handling of Marine Sediment

 

With reference to the EIA report, 27,300 m3 marine sediment would need to be disposed off-site, a DASO permit from the Director of Environmental Protection (DEP) is required for the disposal of marine sediment. At least three months prior to commencement of the dredging work, KSZHJV should submit a Sediment Quality Report (SQR) in accordance with ETWB Technical Circular No.34/2002 in order to apply for a dumping permit from EPD for marine disposal of the sediments under the provisions of DASO. The actual amount of sediment and the allocation of disposal site(s) will be determined based on the results of the SQR to be approved by EPD and Marine Fill Committee (MFC).

The Sediment Quality Report should include the following:

l   Sampling details;

l   Chemical testing results;

l   Quality control records;

l   Proposed classification and delineation of sediment in accordance with ETWB Technical Circular No.34/2002; and

l   Information and / or records as specified by DEP in his approval of sediment sampling and testing plan.

During disposal, the marine sediments should be loaded onto barges, transported to and disposed of at the designated disposal sites to be allocated by the MFC depending on their level of contamination or at other disposal sites after consultation with the MFC and EPD.

Based on the EIA Report, the relevant chemical testing results of the sediment samples, the marine sediment to be dredged from construction site is classified as Category L.

 

4.11.1        Disposal of Sediment

The contaminated sediments should be dredged and transported with great care, and the following mitigation measures as recommended in the EIA should be strictly followed to minimize impact on water quality during transportation of the sediments requiring Type 1 disposal:

l   Bottom opening of barges should be fitted with tight fitting seals to prevent leakage of material;

l   Silt curtains surrounding the closed grab dredger should be deployed as a precautionary measure;

l   Hopper Barge shall equipped with Front End Mobile Unit to monitor the real time loading and location;

l   Hopper barges should not be filled to a level that would cause the overflow of materials or sediment laden water during loading or transportation; and

l   Excess materials should be cleaned from the decks and exposed fittings of barges and hopper dredgers before the vessels are moved.

l   Fill in the Monthly Dumping Report as attached in the Dumping Permit to record the quantity of marine sediment disposal

 

The dredged marine sediments would be loaded onto barges, transported to and disposed of at the designated disposal sites (subject to agreement with Marine Fill Committee and given Type 1 sediment were identified, the disposal sites are typically South Cheung Chau and / or East of Ninepin as open sea disposal). In addition to the mitigation measures as discussed in the EIA report, the barge transporting the sediments to the designated disposal sites should be equipped with tight fitting seals to prevent leakage and should not be filled to a level that would cause overflow of materials or laden water during loading or transportation. In addition, monitoring of the barge loading shall be conducted to ensure that loss of materials does not take place during transportation. Transport barges or vessels shall be equipped with automatic self-monitoring devices as specified by the Direction of Environmental Protection.

 

 

 

 

5 NOTIFICATION TO TRUCK DRIVERS / VESSEL MASTER

 

KSZHJV will write to all truck drivers / vessel master whom he or his sub-contractor(s) has engaged for removal of C&D materials from the Site and draw their attention to the following particular points:

 

l   Each truck carrying C&D materials leaving the Site for a disposal ground must bear a duly completed and stamped CHIT and DDF, irrespective of the location and nature of the disposal ground;

l   Barge carrying C&D materials leaving the Site for a disposal ground must bear a duly completed and stamped Vessel CHIT;

l   The C&D materials must be disposed of at the disposal ground as stipulated in the CHIT / DDF / Vessel CHIT;

l   What constitute and improper disposal and that the Public Fill Committee (PFC) will consider revoking the Dumping Licence from the holder of the offending trucks;

l   Vessel Master shall inform the Officer-in-charge of the Public Fill Reception Facility at least 1 day in advance;

l   Truck drivers must bear a valid Dumping Licence that he can apply from the Civil Engineering and Development Department (CEDD); and

l   Barge must bear a valid Vessel License issued by Marine Department (MD)

 

The Flow Chart of the Trip Ticket System and the notification to truck drivers / vessel master and the receipt form is attached in Appendix D and E respectively.

 

 

 

 

 

6 WASTE MANAGEMENT RECORDS

 

The Construction and Demolition Material Disposal Delivery Form (DDF) will be used for each and every vehicular trip transporting construction and demolition (C&D) material off site.

 

Prior to the vehicle leaving the site, the Supervising Officer’s Representative will insert the date, time of departure, vehicle licence plate number, designated public filling facility/ landfill, and other information as required, and stamp the form. The Supervising Officer’s Representative will then retain the first strip of the form and pass the rest to KSZHJV’s Representative. The form will be carried on board the vehicle at all times throughout the vehicular trip.

 

A comprehensive register of the DDF issued will be maintained and available for inspection by the Supervising Officer’s Representative upon request. The following records will be kept for monitoring of the DDF issued:-

 

Daily Record Summary (DRS) and the Waste Flow Table (WFT) should be completed and submitted to the Supervising Officer’s Representative for record. A sample of DRS and WFT, please refer to Appendix F and G respectively.

 

Waste Flow Table

Record of the quantities of C&D materials generated each month will be maintained using the monthly summary Waste Flow Table (WFT). KSZHJV will complete and submit the monthly summary WFT to the Supervising Officer by not later than the 15th day of each month follows the reporting month, or if it is a General Holiday, the day following the General Holiday, or a later date as agreed by the Supervising Officer. The WFT shall also be made available to ET and IEC.

 

Specific trip ticket and records for internal transfer of C&D materials and imported fill materials will also be kept for monitoring whatever necessary.

 

For recyclable materials, KSZHJV’s Representative will record the quantities of all the recyclable materials before removal off the Site by the recycling contractors, and include the details in the WFT for submission to the Supervising Officer’s Representative.

 

For disposal of marine sediment, Monthly Dumping Report as attached in the Dumping Permit shall be filled in to record the quantity of marine sediment disposal.

 

In order to ensure proper disposal of C&D materials, enhancement measures to further improve the TTS recording system, a video recording system shall be installed and disposal shall be checked against survey record. Such video recording system used to monitor the vehicular exit / entrance of the site and pier area of the site

 

 

 

 


7  WASTE MONITORING AND AUDIT

 

The aims and objectives of waste management audit are:

 

l   To ensure that the waste arising from works are handled, stored, collected, transported and disposed of in an environmentally acceptable manner;

l   To ensure that the handling, storage, collection and disposal of waste arising from the demolition works comply with the relevant requirements under the Waste Disposal Ordinance and its regulations, and this WMP; and

l   To encourage the reuse and recycling of materials.

 

The ET, with assistance from the KSZHJV’s Project Manager or his representative, would audit the waste management practices during the weekly environmental site inspection to evaluate the overall performance of the implementation of the WMP and ensure the appropriate control measures are properly implemented. The results of the waste management audits would be reported in the monthly Environmental Monitoring and Audit reports. The Environmental Mitigation Implementation Schedule (EMIS) related to Waste Management and Daily Cleanliness and Weekly Tidiness Checklist are attached in Appendix H and I respectively.

 

In the event of any non-compliance or complaint against the provisions of this WMP, actions would be taken according to the event and Action Plan for non-compliance and complaints as shown in the following tables.

 

The Plan showing the location of sorting areas are attached in Appendix J.


Step

Day

Action

KSZHJV / ET

SOR

IEC

1

1

Create a new non-compliance record within 1 working day after making an observation during a site audit accompanied by Project Manager or his delegate.  ET sends a Notice of Non-Compliance (NC) to the Contractor, SOR and IEC.  The NC would include the observations and the reasons for non-compliance.

 

 

 

2

2

Propose corrective actions within 1 working day after the receipt for the NC.

 

 

 

3

3

Review and agree with the proposed corrective actions and make additional recommendations as required.

 

 

 

4

2

Implement the proposed corrective actions once they have been agreed.

 

 

 

5

-

Check the implementation of the corrective actions at the next site audit.  Close the non-compliance record if the implementation of the corrective actions is satisfactory/

 

 

 

6

-

Propose preventive actions within 3 working days after the closure of the non-compliance record.

 

 

 

Table 5: Event Action Plan for Non-compliance

■ action party

□ comments on the non-compliance record where applicable

 


Step

Day

Action

KSZHJV/ET

SOR

IEC

1

1

Investigate validity of complaint and to assess whether the source of problem is due to site activity. If complaint is valid and due to site activity, log complaint into Complaint Record Form.

 

 

 

2

2

Propose mitigation measures

 

 

 

3

3

Review and agree with the proposed mitigation measures and propose further mitigation measures if required.

 

 

 

4

2

Implement the proposed mitigation measures once they have been agreed.

 

 

 

5

-

Check the implementation of the mitigation measures at the next site audit. Close out the complaint case if the implementation of the mitigation measures is satisfactory.

 

 

 

6

-

Propose prevention measures within 3 working days after closure of the complaint case.

 

 

 

      Table 6: Event Action Plan for Complaint

■ action party

□ comments on the non-compliance record where applicable